Office Move Timeline by Company Size
How far in advance to plan, from a small office to an enterprise-scale relocation — and why complexity matters more than headcount.
- Every figure sourced to IOMI, FMCSA, IBISWorld & IFMA — never invented
- Independent editorial — not a moving company, nothing to sell you
- No fake reviews or fabricated testimonials, ever
- Free to use, always — no cost, no obligation
Find office moving help
Tell us about the move — we'll help point you to vetted help.
Coordination grows faster than headcount
A ten-person office and a 300-person company aren't simply different scales of the same plan. The coordination problem grows faster than headcount does, because more departments means more scheduling dependencies, more IT complexity, and more building-access coordination on both ends. The three scenarios below are rough estimates; actual timelines still depend on lease dates, building requirements, and how much IT and furniture work is involved.
4–6 weeks
Four to six weeks is usually enough. It calls for a single site survey, a single moving-day schedule, and minimal department sequencing, since a small team is unlikely to need a phased move. IT relocation is typically limited to workstations and a small server closet rather than a dedicated data center. See our small business office move guide for a scaled-down version of the full planning process.
8–12 weeks
This is usually where a dedicated point of contact for the move, whether an internal employee or a hired project manager, starts paying for itself, since coordinating multiple departments, a real IT cutover, and building-access requirements at two locations is more than one person can track informally alongside their regular job.
Building rules don't shrink with company size
Building-specific requirements such as freight elevator reservations, Certificate of Insurance lead time, and loading dock scheduling don't get easier just because a company is small. A 15-person company moving into a high-rise still needs the same COI and elevator coordination as a 150-person company in the same building, which is why complexity, not just headcount, should set the actual timeline.
Frequently asked questions
How long should a small office (under 20 people) plan for?
How long for a mid-size company (20-100 people)?
How long for enterprise-scale moves (100+ people)?
Does company size affect building requirements?
Published 2026-09-06. Reviewed against sources current as of that date — see how we rate.